FAQs

General Questions

Yes, Dastgir PEB has supplid buildings for a range of weather conditions including snow conditions, high desert temperatures, high humidity, proximity to sea, heavy rainfall, cyclone wind speeds, seismic loads, etc, Based on ambient conditions at the site and building usage, we design and manufacture the building to the specified requirements.
We can supply the complete steel building includidng standard accessories. Accessories that are not manufactured by us can be supplied as by outs (Rolled-up doors, cranes, etc.) and can be included in our scope of supply. For mezzanine floors we will provide the steel framing and steel deck. If the flooring is of pre-cast concrete panels, we will provide the floor supports beams.
No, we can provide anything from a small car park shed to massive industrial complexes over thousands of square meters.
The saving would be basically due to less number of column foundations due to large spans and bay spacing plus reduction in column rections due to less dead load of steel . It is not possible to accurately quantify the cost saving as it would vary by type of project. Pre-engineered buildings utilize pierced (column) beam as a general rule, which results in lighte foundations.
IS codes are of an old vintage . Design and serviceablility criteria are based on older materials and do not take into account cost saving with finding high strength materials. We recommend accepting latest International design codes as these have been used literally in millions of PEB buildings in North America and other parts of the world and have a proven record of safety. Each year in the US alone, about 2 Million tons of PEBs are sold based on Interantional codes. Also , American codes are continually updated based on the latest research findings. Hence these codes result in a safer and more economical building. IS codes are more conservative and increase weight and cost without adding value. Howver, if a client insists on IS codes we will design and supply in accordance with these or any other codes.
The inquiry should be sent to our sales office in your region or at salses@dpeb.org. We will esign and price each project based on the specificaitons provided. We will then submit a proposal offer with detailed scope of supply, price delivery and payment terms. Proposal drawings with column reactions are provided on request.
Yes, we will provide column reactions and base plate details on an Anchor Bolt plan drawing. It is our responsibility to design the foundations to support the column reactions based on local conditions.